Today has seen a bunch of pipes get cut and capped, so the builder can move a joist safely, the kitchen/living room wall has been covered by plasterboard, and one side of the steel beam has been covered with fireboard. All of the joists that need to be de-nailed have been de-nailed, and painted with preservative; the builder said it was like the wood was sucking it off of the brush.
Fireboard behind where the fireplace would go Half-fireboarded beam, and the kitchen/living room wall done An old lock.. really? Newly cut pipes, bent back on themselves so the toilet works Not somewhere to be alone New pipes cut back for the joist work Labelled nicely Floorboards in the hallway taken up for cabling Power under the floor in the master bedroom Network and power in the master bedroom Network run, LSOH cable The floorboards show some water staining Gas and rad pipes waiting for boxing.