The tradesmen have made really good progress today. The boxing for the stairwell is completed, the pipes have been run through it, ready for skinning over, the new joists are in place, the porch walls have been tanked, and the back patio is half-laid. You’d almost think this house had stopped causing problems.
New stairwell boxing, opening up headroom View from the top of the stairs A bit of joist. Yeahhhhh Old pavers going back down, drains installed Another view of the drain And another view into the garden Tanking Tanking Tanking New joists, new electric cables, rejoined pipes More of the pipes They fit in really neatly; boxing design by yours truly View from the top of the stairs View from in the room; it’ll be turned into a seat New joists and stringer Water and electric covered over (there’s cement in there) Drops for the new lighting installation