Gutting the kitchen, ensuite
The membrane that was down in the kitchen appeared to have been sweating the floor, and transmitting moisture from the edges towards the centre. With it lifted up out of the way, it’s become very evident that the slab itself is lovely and dry, it’s just the channel between the slab and the walls that…
-
Every single time I think we’re making progress…
Well, we are making progress on the house, but it feels like backwards progress some days. After looking at the back wall of the second bedroom on Friday gone, I told the builder to strip it back and thermal board it. Like other walls, it was covered in 20 – 30 mm of gypsum. Post-stripping,…
-
Skimming underway
Over the last week or so, the electrician has been taking up floorboards and getting holes knocked into walls; a standard skip arrived, got filled, and was removed; the builder finished boarding out the ceiling under the back bedroom, and has started skimming. On the note of the skimming – this guy is good; the…
-
Step done, patio done
The front step has been cast, and the kitchen patio has been finished. I’ve checked the slope/run, and it’s good – the water runs into the drains for the most part. There’s a bit of the upper garden, right next to the drain, that’s lower than the drain, and water skips right past – lands…
-
Tanked walls, new joists.. what goes wrong next?
The tradesmen have made really good progress today. The boxing for the stairwell is completed, the pipes have been run through it, ready for skinning over, the new joists are in place, the porch walls have been tanked, and the back patio is half-laid. You’d almost think this house had stopped causing problems.
-
How did this place not burn down yet?
The de-joisting is continuing apace, and we’ve come up with a design to give the stairs some more headroom, a place to put a light to illuminate the stairs, and a way to deal with the re-joisting. Along the way, we’ve found that some of the removed joists have the weight of balsa wood, and…